Papa News
    No Result
    View All Result
    No Result
    View All Result
    Papa News
    No Result
    View All Result

    Varcoe: It won’t take long to fill up TMX pipeline. What comes next?

    kitsiosgeo by kitsiosgeo
    February 13, 2024
    in Canada
    0
    Varcoe: It won’t take long to fill up TMX pipeline. What comes next?

    [ad_1]

    Breadcrumb Trail Links

    PoliticsEnergyColumnistsBusiness

    In the longer run, will the discussion turn back to building new pipelines — during an era of decarbonization and growing climate concerns — or will that debate end with the completion of TMX?

    Get the latest from Chris Varcoe, Calgary Herald straight to your inbox Sign Up

    Published Feb 12, 2024  •  5 minute read

    Trans Mountain pipeline expansion construction
    Workers lay pipe during construction of the Trans Mountain pipeline expansion, in Abbotsford, B.C., on Wednesday, May 3, 2023. Darryl Dyck/The Canadian Press

    Article content

    Facing transportation bottlenecks — and a divisive pipeline debate — for years, the Canadian oil industry is now eagerly awaiting the startup of the Trans Mountain pipeline expansion.

    As construction on the $30.9-billion project draws to a close and it’s expected to begin commercial operations next quarter, analysts and industry leaders anticipate it won’t be too long before the pipeline — along with other oil export lines in Western Canada — begin to fill up.

    Advertisement 2

    This advertisement has not loaded yet, but your article continues below.

    Calgary Herald

    THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

    Subscribe now to read the latest news in your city and across Canada.

    Unlimited online access to articles from across Canada with one account.Get exclusive access to the Calgary Herald ePaper, an electronic replica of the print edition that you can share, download and comment on.Enjoy insights and behind-the-scenes analysis from our award-winning journalists.Support local journalists and the next generation of journalists.Daily puzzles including the New York Times Crossword.

    SUBSCRIBE TO UNLOCK MORE ARTICLES

    Subscribe now to read the latest news in your city and across Canada.

    Unlimited online access to articles from across Canada with one account.Get exclusive access to the Calgary Herald ePaper, an electronic replica of the print edition that you can share, download and comment on.Enjoy insights and behind-the-scenes analysis from our award-winning journalists.Support local journalists and the next generation of journalists.Daily puzzles including the New York Times Crossword.

    REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

    Create an account or sign in to continue with your reading experience.

    Access articles from across Canada with one account.Share your thoughts and join the conversation in the comments.Enjoy additional articles per month.Get email updates from your favourite authors.

    Sign In or Create an Account

    or

    Article content

    Article content

    And then, the persistent issue of insufficient transportation capacity could rear its head, once again.

    “The supply is coming, and in very short order Western Canada will probably be north of 90 per cent (pipeline) utilization rate again,” said Kevin Birn, a vice-president with S&P Global Commodity Insights.

    “In the long term, we still see Western Canada putting a lot of pressure on its takeaway system . . . We see it filling up progressively over the next 18 to 24 months. By the end of 2025, the system is looking pretty full.”

    On Friday, Calgary-based Enbridge reported that its Mainline pipeline system transported an average of 3.2 million barrels per day (bpd) during the fourth quarter, an all-time high.

    Even with the Trans Mountain expansion coming online this year, the Mainline system is expected to ship about three million bpd in 2024.

    “The Mainline has been basically full for 75 years. So, it’s a trend that continues,” Colin Gruending, Enbridge’s president of liquids pipelines, told analysts Friday on a conference call.

    Western Canadian petroleum producers have grappled with transportation constraints for years amid surging oilsands production.

    Calgary Herald Noon News Roundup

    Noon News Roundup

    Your weekday lunchtime roundup of curated links, news highlights, analysis and features.

    By signing up you consent to receive the above newsletter from Postmedia Network Inc.

    Thanks for signing up!

    A welcome email is on its way. If you don’t see it, please check your junk folder.

    The next issue of Noon News Roundup will soon be in your inbox.

    We encountered an issue signing you up. Please try again

    Article content

    Advertisement 3

    This advertisement has not loaded yet, but your article continues below.

    Article content

    An aerial view of the Imperial Oil Strathcona refinery with the Kinder Morgan and Enbridge oil terminals at Edmonton in 2011
    FILE PHOTO: An aerial view of the Imperial Oil Strathcona refinery with the Kinder Morgan and Enbridge oil terminals in the foreground and the Edmonton skyline in the background on July 31, 2011. Ryan Jackson/Postmedia

    Since 2010, Alberta’s oil output has risen from nearly two million bpd to an average of 3.8 million bpd last year, a record level. During that time, several large pipeline proposals have failed, including Enbridge’s Northern Gateway development and TC Energy’s Keystone XL.

    However, the completion of Enbridge’s Line 3 Replacement Project in 2021 added 370,000 bpd of pipeline capacity out of Western Canada to the United States.

    The Trans Mountain expansion (TMX), which was submitted to the federal energy regulator in 2013, will almost triple the existing line’s capacity by 590,000 bpd.

    “We are short pipe right now. Once TMX comes on, we will likely be long (with excess) export capacity, probably until that 2026 time frame,” said analyst Nate Heywood of ATB Capital Markets.

    “We do think that pipelines will be relatively full by the mid-decade.”

    Recommended from Editorial

    Trans Mountain pipeline construction in Abbotsford, B.C., on November 29, 2023.

    Varcoe: ‘A long time coming’: Trans Mountain pipeline expansion aims to be finished in the coming weeks

    Workers lay pipe during construction of the Trans Mountain pipeline expansion on farmland, in Abbotsford, B.C., 2023.

    Trans Mountain pipeline to start filling with oil in February

    Workers lay pipe during construction of the Trans Mountain pipeline expansion on farmland, in Abbotsford, B.C., on Wednesday, May 3, 2023. The company building the Trans Mountain pipeline expansion has been cited for environmental non-compliance related to its management of recent flooding in B.C.

    Regulator calls out Trans Mountain for ’environmental non-compliance’ in B.C.

    Workers lay pipe during construction of the Trans Mountain pipeline expansion, in Abbotsford, B.C., on Wednesday, May 3, 2023. The Canada Energy Regulator is slated to hear oral arguments Friday from the company building the Trans Mountain pipeline expansion on its request for a pipeline variance.THE CANADIAN PRESS/Darryl Dyck

    Trans Mountain pipeline variance request approved by Canada Energy Regulator

    Advertisement 4

    This advertisement has not loaded yet, but your article continues below.

    Article content

    While some experts thought the startup of TMX would cut into Enbridge’s Mainline volumes with added competition, Gruending noted supply has “structurally and permanently grown” with rising demand in recent years.

    In 2023, western Canadian oil supply increased by 150,000 barrels per day, he noted. This year, supply will grow by between 250,000 and 300,000 bpd — with another 200,000 added to the mix next year.

    At times in the past decade, a lack of transportation capacity has led to a steep price differential between U.S. benchmark crude and Western Canadian Select heavy oil.

    The discount reached as high as US$50 a barrel at one point in 2018 during a period of pipeline constraint.

    (Provincial data indicates the price differential last year averaged US$18.65 a barrel.)

    “There is no doubt we’re going to need more pipe within this decade,” said Tristan Goodman, president of the Explorers and Producers Association of Canada.

    “Demand for oil continues to increase on a global basis, year after year after year.”

    Tristan Goodman
    Tristan Goodman, president of the Explorers and Producers Association of Canada (EPAC), speaks during the Canadian Association of Energy Contractors 2023 drilling forecast luncheon at the Westin Calgary on November 23, 2022. Gavin Young/Postmedia file

    While the International Energy Agency has forecast oil demand will peak this decade, it projects global consumption will increase by 1.2 million barrels per day this year, after hitting a record of nearly 102 million bpd in 2023.

    Advertisement 5

    This advertisement has not loaded yet, but your article continues below.

    Article content

    Hal Kvisle, former CEO of Trans Canada Pipelines, noted producers in Western Canada have added incremental output in recent years by taking steps to debottleneck oilsands operations, rather than building new greenfield projects.

    He expects growth will continue, but doesn’t foresee industry players proposing major new export pipelines, given the hurdles and federal policies facing the sector.

    However, there is excess gas pipeline capacity heading east and south that could be converted to move oil, and there’s also the potential to move more oil to the U.S. by train.

    “We could easily add one or two million barrels a day (from) the oilsands through new projects, but people aren’t going to kick off those new projects unless they have some comfort around federal policies and some comfort there is going to be pipe to get the oil to market,” said Kvisle.

    “I think we will build more pipelines and I think Canadian oilsands production will grow, but I don’t see any of that happening in the next five years — other than the little incremental things.”

    Trans Mountain Expansion graphic

    Once TMX is completed, total pipeline export capacity in Canada will reach more than 4.8 million bpd, Birn said.

    Advertisement 6

    This advertisement has not loaded yet, but your article continues below.

    Article content

    Midstream companies will also continue to find ways to expand their existing systems with smaller-scale initiatives.

    “We feel the capacity egress will be fairly balanced . . . but if more is needed, we’ll manage that by optimizing our system,” Enbridge said in a statement.

    “We have 200,000 bpd of expansion potential on the Mainline that involves debottlenecking and small-scale capacity additions.”

    In the longer run, will the discussion turn back to building new pipelines — during an era of decarbonization and growing climate concerns — or will that debate end with the completion of TMX?

    “We will always grow production if the world wants our production . . . The problem for me is that after Trans Mountain, I don’t see how anybody is going to build another pipeline,” said Richard Masson, former CEO of the Alberta Petroleum Marketing Commission.

    “The long-term answer is we have to find a balance in how quickly we grow, with how much market access we can get. It’s a big challenge.”

    Chris Varcoe is a Calgary Herald columnist.

    cvarcoe@postmedia.com

    Article content

    Share this article in your social network

    [ad_2]

    Source link

    Tags: fillLongPipelineTMXVarcoeWont
    Previous Post

    The Chiefs Won the Super Bowl. Will Taylor Swift Visit the White House?

    Next Post

    ICYMI: Tucker’s a ‘useful idiot,’ Florida Republicans are in denial

    Next Post
    ICYMI: Tucker’s a ‘useful idiot,’ Florida Republicans are in denial

    ICYMI: Tucker's a 'useful idiot,' Florida Republicans are in denial

    Leave a Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    CATEGORIES

    • Africa
    • Asia Pacific
    • Australia
    • Business
    • Canada
    • Cryptocurrency
    • Economy
    • Entertainment
    • Europe
    • Gossips
    • Health
    • India
    • Lifestyle
    • Middle East
    • New Zealand
    • Politics
    • Sports
    • Technology
    • Travel
    • UK
    • USA

    LATEST UPDATES

    • How To Apply For A Visa For Armenia
    • Starmer pushed on EU youth mobility as Tory leadership rivals make final pitch – live
    • Aamir Khan offers condolences after ex-wife Reena Dutta’s father passes away

        © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

        No Result
        View All Result

            © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.