Papa News
    No Result
    View All Result
    No Result
    View All Result
    Papa News
    No Result
    View All Result

    Residents angry over approval of High River-area renewable gas plant

    kitsiosgeo by kitsiosgeo
    December 14, 2023
    in Canada
    0
    Residents angry over approval of High River-area renewable gas plant

    [ad_1]

    Breadcrumb Trail Links

    Local NewsEnergy

    Plant planned five kilometres west of High River is to use manure from an adjacent feedlot and waste produce from Calgary

    Published Dec 14, 2023  •  Last updated 16 minutes ago  •  4 minute read

    High River biodigester
    A local group of people around High River had hoped to stop Tidewater Renewables and Rimrock RNG’s first Alberta-based renewable natural gas facility west of High River. Dana Zielke/Postmedia file

    Article content

    Neighbours opposed to a manure-fed renewable natural gas plant proposed for the High River area say they’re devastated by the province’s approval of the project.

    The huge plant planned for a spot five kilometres west of High River is known as a biodigester, which is to use manure from an adjacent feedlot and waste produce from Calgary, has been met with heated opposition by detractors who fear its resulting odours, and its effect on water, traffic and property values.

    Advertisement 2

    This advertisement has not loaded yet, but your article continues below.

    Calgary Herald

    THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

    Subscribe now to read the latest news in your city and across Canada.

    Unlimited online access to articles from across Canada with one account.Get exclusive access to the Calgary Herald ePaper, an electronic replica of the print edition that you can share, download and comment on.Enjoy insights and behind-the-scenes analysis from our award-winning journalists.Support local journalists and the next generation of journalists.Daily puzzles including the New York Times Crossword.

    SUBSCRIBE TO UNLOCK MORE ARTICLES

    Subscribe now to read the latest news in your city and across Canada.

    Unlimited online access to articles from across Canada with one account.Get exclusive access to the Calgary Herald ePaper, an electronic replica of the print edition that you can share, download and comment on.Enjoy insights and behind-the-scenes analysis from our award-winning journalists.Support local journalists and the next generation of journalists.Daily puzzles including the New York Times Crossword.

    REGISTER TO UNLOCK MORE ARTICLES

    Create an account or sign in to continue with your reading experience.

    Access articles from across Canada with one account.Share your thoughts and join the conversation in the comments.Enjoy additional articles per month.Get email updates from your favourite authors.

    Article content

    Article content

    Opponents had hoped the province would slap a moratorium on its approval as it has on renewable electricity projects, but the province said that only applies to electricity generation.

    After a review process that had been extended in March, Alberta Environment and Protected Areas (AEP) has given a green light to the $70-million, 41.4-hectare project to be operated by Rimrock Renewables.

    An approval document dated Dec. 11, due to expire in a decade, subjects it to numerous operating and monitoring conditions, many related to odour control and to cover reclamation costs before it goes online.

    “As a condition of the approval, Rimrock is required to implement an odour control plan using global best practices and to develop an odour management and response program before the facility starts operating,” AEP spokesman Tim McMillan said in an email.

    “Alberta has a clear and robust regulatory review process in place, and that includes the option to file an appeal with Environmental Appeal Board of this or any other decision.”

    It still requires approval from Foothills County, which would host the facility — cold comfort to opponents.

    Calgary Herald Noon News Roundup

    Noon News Roundup

    Your weekday lunchtime roundup of curated links, news highlights, analysis and features.

    By signing up you consent to receive the above newsletter from Postmedia Network Inc.

    Thanks for signing up!

    A welcome email is on its way. If you don’t see it, please check your junk folder.

    The next issue of Noon News Roundup will soon be in your inbox.

    We encountered an issue signing you up. Please try again

    Article content

    Advertisement 3

    This advertisement has not loaded yet, but your article continues below.

    Article content

    “We’re all still reeling from the decision . . . (it’s) a sad day for our community,” project opponent Carrie Derish said Thursday.

    After spending nearly two years campaigning against the application, a furious Benita Estes, who lives 200 metres from the site, said she feels betrayed and played.

    “(Political leaders and company officials) went through the motions — ‘look at us, we’re meeting with the residents,’ ” said Estes, adding more than 2,000 people have signed a petition opposing the facility.

    “It was in the bag as soon as (Rimrock) got the government grants. It’s about who greases pockets and lobbies the most.”

    And she expressed little faith the conditions would be observed or enforced.

    Using livestock waste from its adjacent, existing feedlot, Rimrock says it plans to produce 450,000 gigajoules of renewable natural gas (RNG) per year, enough to meet the needs of 6,000 homes in Foothills County.

    Its parent firm, Tidewater Renewables, announced in fall 2022 it had reached an agreement with FortisBC to purchase the green credits of the RNG over the next 20 years.

    Advertisement 4

    This advertisement has not loaded yet, but your article continues below.

    Article content

    Rimrock officials and its consultants have said the plant would reduce odours already produced by that feedlot by 47 per cent, and eliminate 95 per cent of processing odours, while its design will protect surrounding groundwater and the Highwood River, 2.8 kilometres away.

    But critics say the lack of a cover on the plant’s effluent lagoon leaves open the problem of odours and wonder why it isn’t following the designs of other biogas plants that don’t have open-air ponds.

    Rimrock Renewables
    A biodigester would be built near the Rimrock Renewables feedlot, about five kilometres west of High River. Google Maps

    Project opponents fear possible contamination of local water supply

    The CEO of Tidewater Renewables called local opposition “a small, vocal group” who’ll be proven wrong on the odours issue.

    “I’m pretty confident it’ll reduce smells compared to the (existing) feedlot,” said Robert Colcleugh, adding plant operators are serious about meeting their approval obligations.

    “We’ll obviously meet any regulatory requirements and we’ve been in dialogue with the government on that,” he said.

    The project has received some provincial and federal grants but its main fiscal impetus is its contract with Fortis, with the project posing another piece of Alberta’s renewable energy puzzle, though with limitations.

    Advertisement 5

    This advertisement has not loaded yet, but your article continues below.

    Article content

    “There’s not a lot of product to be able to scoop up and put in a biodigester but it’s an important bridge, an important mix in a portfolio of global energy solutions,” said Colcleugh.

    Proposal critic Brent Schlenker said he fears the lagoon will be a source of E. coli and will threaten the local aquifer, which is particularly vulnerable during the current drought conditions.

    “High River is one of the most beautiful communities in Alberta and this an endangerment to the community,” he said.

    “Why are they experimenting with that size of a facility three miles from town? When they find a problem, it’s usually too late to fix it when you’re talking about groundwater.”

    He said the approval could sour some on the UCP government in an area where it’s enjoyed overwhelming electoral support in the past two elections.

    “This is not going to look favourably on the UCP,” said Schlenker.

    Critics have said a more suitable location for the facility would be an industrial corridor just north of High River that hosts the Cargill meat processing plant.

    Nearby neighbour Estes said if the plant becomes a reality, she couldn’t sell her property even if she wanted to move.

    Advertisement 6

    This advertisement has not loaded yet, but your article continues below.

    Article content

    “Who’s going to want to come and live here?” she said.

    “We bought here as country-residential, not next to industrial land.”

    Estes said she and her colleagues will challenge the decision at the province’s Environmental Appeal Board.

    Foothills County could withhold an approval of a land use redesignation but it would be pointless in the face of a provincial government that would ultimately prevail, said Reeve Delilah Miller.

    And she said there is support for the plant and the possibility it would tame current feedlot odours.

    “There are a lot of people on the other side saying ‘why don’t we try this?’ And I feel the province has placed a lot of regulator hoops on it,” said Miller, adding re-locating the plant would simply shift odours around the county and High River.

    Rimrock has said, if approved, it expects to begin construction of the plant next year.

    But Colcleugh said that without municipal approval and sufficient “commercial arrangement,” construction isn’t imminent.

    BKaufmann@postmedia.com

    X(Twitter): @BillKaufmannjrn

    Related Stories

    The biodigester would be built near the Rimrock feedlot, about five kilometres west of High River.

    Neighbours of proposed waste processor unswayed by company’s assurances

    File photo of a solar farm in Alberta.

    Proposed solar farm near High River deemed too dangerous for birds

    Article content

    Share this article in your social network

    [ad_2]

    Source link

    Tags: angryApprovalGashighplantrenewableresidentsRiverarea
    Previous Post

    This Bill of Rights Day, Let's Celebrate the Preamble

    Next Post

    ‘Bitcoin NFT’ Hysteria Comes to Sotheby’s as Super-Mario-Style Mushroom Character Tops $200K

    Next Post
    ‘Bitcoin NFT’ Hysteria Comes to Sotheby’s as Super-Mario-Style Mushroom Character Tops $200K

    'Bitcoin NFT' Hysteria Comes to Sotheby's as Super-Mario-Style Mushroom Character Tops $200K

    Leave a Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    CATEGORIES

    • Africa
    • Asia Pacific
    • Australia
    • Business
    • Canada
    • Cryptocurrency
    • Economy
    • Entertainment
    • Europe
    • Gossips
    • Health
    • India
    • Lifestyle
    • Middle East
    • New Zealand
    • Politics
    • Sports
    • Technology
    • Travel
    • UK
    • USA

    LATEST UPDATES

    • How To Apply For A Visa For Armenia
    • Starmer pushed on EU youth mobility as Tory leadership rivals make final pitch – live
    • Aamir Khan offers condolences after ex-wife Reena Dutta’s father passes away

        © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

        No Result
        View All Result

            © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.